Purchase carbon credits
High integrity carbon credits to offset your emissions
Carbon credits originated from solar power plant investments
Offset your emissions and comply for the ESG regulations with high integrity carbon credits originated from Hungarian electromobility investments.
Available VERs | Price per tonne | Quality |
4,368 | On demand | HIGH |
About the Issuance Program
Project type: | Green energy production (off-grid solar power plant operation) |
Location of project: | Hungary, European Union |
Issuance period: | 21.10.2022 - 30.06.2024 |
Year of Issuance: | 2024 |
Status of issuance: | VCU (Voluntary Carbon Unit) |
Underlying standard: | international Carbon Cycle, Quality Technology Change Standard v2 |
Methodology: | Post-financing of investments in Green Energy production by issuing Carbon Credits Technology Based Verified Emission Reduction |
Registry: |
OurOffset Nonprofit LLC. |
Verifier: | Green Cross Hungary Association |
Type of credit: | Technology Based Verified Emission Reduction |
Type of receiver: | End-user |
Co-benefits: |
Total volume of CO2 avoided*(GHG impact)
4 368 t
Total amount of VCUs originated*
4 368
Available amount
of VCUs
4 368
* in issuance period
Partners
Each issuance program consists of carbon credits originated from projects that may be different in their project owner and location, but similar in their nature. Emprovia Zrt. aggragates these projects, and issues carbon credits that are based on the same carbon market procedure, calculation method, legal framework, and certification.
Below you can learn more about the individual projects.
JÁSZBERÉNY
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: | MVM Émász Áramhálózati Kft.(MVM Northern Hungarian Electric Network LLC) | |
Address: | 5100 Jászberény, Necső telep 1., lot number: 0274/91 HUNGARY | No. of current grid connection agreement: |
HC 20000279/010 |
|
URL: | https://jp.hu/hu/d_center_jz.html | Date of grid connection agreement: | 27th May, 2024 | |
Rated power: | 9.168 MVA | |||
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
|||
No. of permit of operation: | JN/ 54/ 00441-20/ 2022 | Inverters: | 9 pcs of Huawei SUN2000-33KTL 30kW/pc and 3 pcs of SIEL TIER 4 3056 central inverter 3.056kW/pc | |
Date of permit of operation: | 19th September, 2022 | Solar panels: | 25,560 pcs of Longi LR4-72HPH 440M 440Wp solar panel. DC power: 11,246.4 kWp |
CARPORT
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: | MVM Émász Áramhálózati Kft.(MVM Northern Hungarian Electric Network LLC) | |
Address: | 5100 Jászberény, Necső telep 1., lot number: 0268/142 HUNGARY |
No. of current grid connection agreement: |
HC 20000279/010 |
|
Rated power: | 270 kVA | Date of grid connection agreement: | 27th May, 2024 | |
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
|||
No. of permit of operation: | JN/ 54/ 00846-14/ 2024 | Inverters: |
3 pcs of 40 kW Huawei SUN-2000 40.0 KTL-M3 and 5 pcs of 30 kW Huawei SUN-2000 30.0 KTL-M3 |
|
Date of permit of operation: | 12nd August, 2024 | Solar panels: |
700 pcs of 545 Wp/pc monocrystalline solar panels, Risen RSM110-8-545M 545 Wp Installed capacity: 381.5 kWp; Inverter power: 270,0 kVA |
MERCEDES
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: | MVM Émász Áramhálózati Kft.(MVM Northern Hungarian Electric Network LLC) | |
Address: | 5100 Jászberény, Necső telep 1., lot number: 0261/7 HUNGARY |
No. of current grid connection agreement: |
HC 20000279/010 |
|
Rated power: | 2.400 kVA | Date of grid connection agreement: | 27th May, 2024 | |
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
|||
No. of permit of operation: | JN/ 54/ 00844-16/ 2024 | Inverters: |
2,400 kW, central inverter station consisting of |
|
Date of permit of operation: | 12th August, 2024 | Solar panels: |
5,202 pcs of Risen RSM110-8-545M 545Wp solar panels. DC power: 2,835.09 kW |
WAREHOUSE NO. 34.
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: | MVM Émász Áramhálózati Kft.(MVM Northern Hungarian Electric Network LLC) | |
Address: |
5100 Jászberény, Necső telep 1., |
No. of current grid connection agreement: |
HC 20000279/010 |
|
URL: | https://jp.hu/hu/d_center_jz.html | Date of grid connection agreement: | 27th May, 2024 | |
Rated power: | 560 KVA | |||
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
|||
No. of permit of operation: | JN/ 54/ 00845-14/ 2024 | Inverters: |
560kW: 5 pcs Huawei SUN2000-100KTL-M1 and 1 pc Huawei SUN-2000-60KTL-M0 inverter with 60 kVA |
|
Date of permit of operation: | 12th August, 2024 | Solar panels: |
1472 pcs of Risen RSM40-8-400M 440Wp solar panels, DC power: 647.68kWp |
WAREHOUSE NO. 36.
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: | MVM Émász Áramhálózati Kft.(MVM Northern Hungarian Electric Network LLC) | |
Address: |
5100 Jászberény, Necső telep 1., |
No. of current grid connection agreement: |
HC 20000279/010 |
|
URL: | https://jp.hu/hu/d_center_jz.html | Date of grid connection agreement: | 27th May, 2024 | |
Rated power: | 900 kVA | |||
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
|||
No. of permit of operation: | JN/ 54/ 01030-7/ 2022 | Inverters: |
900 kW, 9 pcs of Huawei SUN2000-100KTL-M1 inverter |
|
Date of permit of operation: | 19th October 2022 | Solar panels: |
3132 pcs of Risen RSM40-8-400M 400Wp solar panels, DC power: 1252.8kWp |
NAGYRÉDE
Activity: | Off-Grid Solar Power Plant Operation | Issuer of grid connection agreement: |
Émász Hálózati Kft. |
|
Address: |
3214 Nagyréde, Kettős csárda 2., |
No. of current grid connection agreement: |
HC 20004116/006 |
|
URL: | https://jp.hu/hu/d_plastic_na.html | Date of grid connection agreement: | 18th April, 2017 | |
Rated power: | 380 kVA | |||
Issuer, number and date of permit of operation: |
At the time the photovoltaic (PV) power plant was established, there was no legal requirement in Hungary to obtain an operational permit for such facilities. Currently, the plant is undergoing capacity enhancements, and once these improvements are completed, the necessary operational permit will be formally requested. |
|||
Inverters: | 19 pcs of 20kW inverters: 4 pcs are Solplanet ASW20K LT-G2 and 15 pcs are Growatt 20000UE | Solar panels: |
1,672 pcs of 260 Wp/pc polycrystalline solar panels, Amerisolar AS-6P30 Installed capacity: 434.72 kWp; Inverter power: 380 kVA |
CERTIFICATION
Of mitigia’s MRV-based aggregation software
The digital MRV software we use for calculating and generating the carbon credits for each green investment, has been verified by third party sustainability auditor Green Cross Hungary.
"It is confirmed with mathematical certainty that the operation of the Software alignes with the CCP (Core Carbon Principles) established by the ICVCM (Integrity Council for the Voluntary Carbon Market), with the iCC (international Carbon Cycle) QTCS (Quality Technology Change Standard) v2 carbon credit generation standard, and with other standards named in the GCHEMP-61124 certification, as well as the generation methodology by the formulas recorded in
the know-how "Post-financing of fleet electrification projects by issuing carbon credits".
Present certificate of full compliance covers the entire, integrated carbon credit generation system and proves its correct operation."
JÁSZ PLASZTIK PV PARK I.
Activity: | Solar Power Plant operation |
Address: | 5100 Jászberény, lot number: 0274/91 HUNGARY |
URL: | https://jp.hu/hu/d_center_jz.html |
Rated power: | 9.168 MVA |
Issuer of permit of operation: |
Jász-Nagykun-Szolnok Megyei Kormányhivatal, Közlekedési, Műszaki Engedélyezési, Mérésügyi Fogyasztóvédelmi Főosztály, Mérésügyi és Műszaki Biztonsági Osztály
(Jász-Nagykun-Szolnok County Government Office, Traffic, Technical Licensing, Metrology and Consumer Protection Department, Metrology and Technical Safety Division)
|
No. of permit of operation: | JN/ 54/ 00441-20/ 2022 |
Date of permit of operation: | 19th September, 2022 |
Issuer of grid connection agreement: |
MVM Émász Áramhálózati Kft. |
No. of grid connection agreement: | HH 200002279/008 |
Date of grid connection agreement: | 12th July, 2022 |
SDGs: | |
JÁSZ PLASZTIK PV PARK II.
Activity: | Solar Power Plant operation |
Address: | 3214 Nagyréde, lot number: 0242/51 HUNGARY |
URL: | https://jp.hu/hu/d_plastic_na.html |
Rated power: | 380 kVA |
Issuer of permit of operation: | |
No. of permit of operation: | |
Date of permit of operation: | |
Issuer of grid connection agreement: | |
No. of grid connection agreement: | |
Date of grid connection agreement: | |
SDGs: | |